Wooden Venetian Blinds
How to Install Your Vertical Blinds Easily?
by admin- 2018-05-18 14:33:06

A. Your Blinds ( PVC, Fabric, or Aluminum Vertical Blinds for you to choose )

Your blind is supplied with a Metal Pre-coated Headrail that can be easily cut to reduce the length, if required.

The latest safety designed Wand Contral unit allows you to easily draw the Blind Vane & rotate them to the required angle.


B. Pack Contents

Metal Headrail-fully assembled with a complete plastic retractable track, hook units, and plastic endcaps for headrail.

Other Parts: Wand Control, Headrail Fixing Brackets, Fixing Screw & Wall Plugs, Adjustable Vane Hangers, Vane Bottom Weights, Stabilising Chain. Also, you may need the following tools:


C. The Headrail

If you wish to reduce the length:

1. Fully extend retractable track (hook units) along the Metal Headrail.

2. Remove the adjustable plastic Headrail End-cap, adjacent to the Wand Control Hook, by simply unscrewing 3 screws.

3. Measure the length you require, starting from the end opposite the Wand Control end - mark position - if your mark is above a hook unit, move the hook unit, until it is clear of your mark.

4. Cut completely through the Metal Headrail using your hacksaw - make sure your cut is square.

5. Take the small of - cut piece & remove the plastic retractable end piece - by simply removing the adjustable strap underneath & retain.

6. Now fit back the retained retractable end piece to the rest of the plastic track by gently squeezing the sides of the plastic strap underneath the retractable track.

7. Fit back the plastic Endcap to Metal Headrail.


D. Installing the Headrail

1. Fit the Headrail using the brackets provided. The Wand Control can be at eighter left or right hand side.

2. When fitting to plaster, use the plastic Wall Plugs provided.

3. Each outer bracket should be approximately 10-15 cm from the end of the Metal Headrail with the remaining brackets equally spaced between.

4. If the Vanes are not hanging evenly, turn the Wand in any direction until it comes to stop. Then force the Wand further, the clicking sound is the Vanes lining up. Repeat this process in the opposite direction until the Vanes hang evenly.


E. Fitting the Vanes

1. Fit the adjustable Vane Hangers to the Metal Headrail hook units.

2. Place the Weights in the bottom pockets of the Vanes.

3. If adjustment is required, remove the Vanes from the adjustable Vane Hangers (Top) & adjust length as necessary.

4. When satisfied with the length of the Vanes, trim the excess vane with Sharp Pair of Scissors.——Note: Ensure the vane is folded in the same direction as the bottom pockets!

5. Repeat this process for the remaining Vanes.

6. Chain on the Stabilising Chain to Bottom Weights.


Request a free quote

If you have any problem about our blinds or machines,please write down your needs and problems, our sales will try to answer you in 24 hours. Thank you for your attention!

contact us now